Browse Publications Technical Papers 2007-01-3885
2007-09-17

Process Simulation Ensures Implementation of Lean Manufacturing Principles in AIRBUS A320 Equipment Installation 2007-01-3885

The key to efficient production of commercial aircraft is the development of a manufacturing system which allows the production of many different versions at the lowest possible cost and in the shortest possible throughput time. AIRBUS has accepted this challenge and implemented such a system in the form of a “moving line” at its Hamburg plant for the equipment installation of the A320 family.
This new production system, which was designed in accordance with the flow principle, has been validated and optimised by means of a process simulation. With the application of this technique, the duration of the ramp-up phase has been decidedly shortened by early detection and reduction of faulty process sequences. In parallel with this development, the production and logistic system has been optimised with respect to the required target parameters.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

Advanced Low-cost Titanium-alloy Materials for Aerospace Fastener Applications

2007-01-3839

View Details

TECHNICAL PAPER

On the Use of Force Feedback for Cost Efficient Robotic Drilling

2007-01-3909

View Details

TECHNICAL PAPER

Robotic Friction Stir Welding

2007-01-3811

View Details

X