Tube Hydroforming Process Optimal Design by Improved Dynamic Programming

Paper #:
  • 2011-01-0236

Published:
  • 2011-04-12
Citation:
Sheng, Z., "Tube Hydroforming Process Optimal Design by Improved Dynamic Programming," SAE Technical Paper 2011-01-0236, 2011, https://doi.org/10.4271/2011-01-0236.
Pages:
7
Abstract:
Due to its capability to make tubular components with high structural rigidity and low mass, tube hydroforming (THF) is an important manufacturing process to make lightweight automotive structural components, such as engine cradles, crank shafts, seat frames, roof bow and instrument panel beam etc. In order to integrate more functions, tube hydroformed components (THC) usually have complex geometry and are formed from a straight tube usually by three stages, which are programmable CNC bending, pre-crush and hydroforming. Since the complexity of component geometry, failures, such as fracture and buckling, could happen simultaneously at different spots. Tube bending and hydroforming process are designed to eliminate multiple failures and thus the THF development is tedious and time consuming. In this study, a multiobjective dynamic programming method is developed to optimize the THF process and demonstrated on an automotive component.
Access
Now
SAE MOBILUS Subscriber? You may already have access.
Buy
Select
Price
List
Download
$28.00
Mail
$28.00
Members save up to 42% off list price.
Share
HTML for Linking to Page
Page URL

Related Items

Technical Paper / Journal Article
2011-04-12
Technical Paper / Journal Article
2011-05-17
Technical Paper / Journal Article
2009-05-19
Standard
2015-06-30
Training / Education
2018-05-01
Training / Education
2017-06-15
Training / Education
2018-11-07
Training / Education
2017-10-27
Technical Paper / Journal Article
2011-05-17