Browse Publications Technical Papers 2011-01-2639
2011-10-18

Flexible Tooling for Wing Box Rib Clamping and Drilling 2011-01-2639

Currently the wing box rib assembly process requires the manual location and temporary fixing of components within product specific jig or fixtures for drilling. After drilling and reaming, parts are separated, cleaned, deburred prior to adding sealant, reclaiming and final bolting, but this may significantly increase cost, manufacturing lead-time, reduces flexibility and cannot usually be economically modified for use on other aircraft types. Due to potential increase in demand for the next generation single isle aircraft, existing tooling solutions have to be improved and new technologies have to be developed. This paper describes the development and testing of flexible tooling to provide clamping and support for drilling wing box ribs to mating rib posts within a restricted environment. Results are presented along with a discussion of the problems that may be encountered during clamping trials.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
We also recommend:
JOURNAL ARTICLE

Automatic Bolt Feeding on a Multifunction Flextrack

2011-01-2773

View Details

TECHNICAL PAPER

New Approach for Chromate Free Coatings in Aircraft Applications: Modified Zinc Pigments

2011-01-2741

View Details

JOURNAL ARTICLE

LTD Bolt Injection System

2011-01-2776

View Details

X