Browse Publications Technical Papers 2015-01-0439
2015-04-14

Advantages of Simulation Based Reliability Growth Planning 2015-01-0439

The current reliability growth planning model used by the US Army, the Planning Model for Projection Methodology (PM2), is insufficient for the needs of the Army. This paper will detail the limitations of PM2 that cause Army programs to develop reliability growth plans that incorporate unrealistic assumptions and often demand that infeasible levels of reliability be achieved. In addition to this, another reliability growth planning model being developed to address some of these limitations, the Bayesian Continuous Planning Model (BCPM), will be discussed along with its own limitations. This paper will also cover a third reliability growth planning model that is being developed which incorporates the advantageous features of PM2 and BCPM but replaces the unrealistic assumptions with more realistic and customizable ones. The internal workings of this new Tank Automotive Research Development and Engineering Center (TARDEC) developed simulation-based model will be delved into with a focus on the advantages this model holds over PM2 and BCPM.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
STANDARD

Reliability Program Standard

JA1000_202108

View Details

TECHNICAL PAPER

A Functional View of Engineering

1999-01-3218

View Details

TECHNICAL PAPER

Customer Oriented Design

2001-01-3899

View Details

X