Browse Publications Technical Papers 2015-01-2110
2015-06-15

Certification Flight Tests in Natural Icing of the PZL Mielec M28 Commuter Turboprop Airplane 2015-01-2110

In 2014 PZL Mielec obtained an EASA Type Certificate extension for the PZL M28 05 airplane for flight into icing conditions and this has been validated by the FAA. Thus, a project that lasted four years was finished successfully. During this period, activities consisted of icing analyses, wind tunnel tests in the NASA Glenn Research Center Icing Research Tunnel, and natural icing flight tests, artificial icing flight tests, flight tests with simulated ice shapes, and calibration tests. Flights in measured natural icing conditions began during the spring of 2009 and certification flight tests were performed in 2012. The natural icing test flights, apart one flight in the USA, were performed in Poland in the Mielec area. The final test campaign can be divided into two phases: (1) March -April flight tests campaign; and (2) November - December flight test campaign, the latter after introducing some design changes in airframe ice protection system.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

Propulsive Efficiency and Aircraft Drag Determined From Steady State Flight Test Data

850872

View Details

TECHNICAL PAPER

The Volvo S40/V50 PZEV MY2007 with an Optimized 2.4l Engine

2007-01-1260

View Details

JOURNAL ARTICLE

Korean Utility Helicopter KUH-1 Icing Certification Program

2019-01-1989

View Details

X