Enhanced Process to Improve Supplier’s Quality and Reduce Warranty

Paper #:
  • 2017-01-1604

Published:
  • 2017-03-28
DOI:
  • 10.4271/2017-01-1604
Citation:
Michael, C., Jawad, B., Liu, L., Fernandez, V. et al., "Enhanced Process to Improve Supplier’s Quality and Reduce Warranty," SAE Technical Paper 2017-01-1604, 2017, doi:10.4271/2017-01-1604.
Pages:
8
Abstract:
The objective of this research is to develop a component based enhanced production process after End of Line (EOL) testing. This process will add more quality validation evaluations, but will not require any disassembling of the parts or damage to them. It will help the suppliers to avoid scrap and rework parts as well as General Motors (GM) to reduce warranty and recalls.An Enhanced Production Process was implemented in March, 2016 at a supplier in Mexico. The Enhanced Audit Station implementation is to ensure that the supplier is satisfying the Production Part Approval Process (PPAP) requirements. The most important four components are: Touch Appearance Lighting and Color (TALC), Appearance Approval Report (AAR), Dimensional Checks, and Function Testing.Through statistics, a pilot study was conducted to correlate the selected variables to reduce warranty. The study is to verify the supplier’s adherence to the key points of quality related to PPAP: Design Failure Mode and Effect Analysis (DFMEA), Process Failure Mode and Effect Analysis (PFEMA), First Time Quality (FTQ), Incidents per Thousand Vehicles (IPTV), Problem Resolution Report (PRR), Controlled Shipping (CS), and the complexity of the part.
Access
Now
SAE MOBILUS Subscriber? You may already have access.
Buy
Select
Price
List
Download
$27.00
Mail
$27.00
Members save up to 40% off list price.
Share
HTML for Linking to Page
Page URL

Related Items

Training / Education
2017-06-15
Training / Education
2017-06-15
Technical Paper / Journal Article
2011-04-12
Technical Paper / Journal Article
2011-04-12
Technical Paper / Journal Article
2011-04-12
Training / Education
2017-06-15
Standard
2013-03-11
Standard
2009-11-20