Implementation of Lean Approaches in Proto Body Build to Improve Productivity and Flexibility

Paper #:
  • 2017-28-1965

Published:
  • 2017-07-10
Citation:
Selvam, G., Vaidhyanathan, S., Sebastian, P., Zaheer Abdulla, M. et al., "Implementation of Lean Approaches in Proto Body Build to Improve Productivity and Flexibility," SAE Technical Paper 2017-28-1965, 2017.
Pages:
5
Abstract:
Lean approaches are being implemented in various manufacturing facilities across the globe. The application of lean approaches are extended to Body proto build shop to maximize the efficiency of the shop with lesser floor space and optimized equipment. Weld fixture, Weld equipment and assembly tools are the major tools required essentially for proto BIW assembly. This paper explains how the Weld equipment planning was carried out with lean approaches and implemented effectively in proto body assembly shop. The implemented lean concepts are compared with Italy and Japanese proto body build makers to validate the frugal planning of the facility for the said intent. The implemented facility is capable of producing more than a model at a time. Weld parameter selection for weld gun, gun movement to the fixture with minimized change over time and movable weld gun gantry are the lean approaches implemented.
Access
Now
SAE MOBILUS Subscriber? You may already have access.
Buy
Select
Price
List
Download
$27.00
Mail
$27.00
Members save up to 40% off list price.
Share
HTML for Linking to Page
Page URL

Related Items

Article
2017-03-13
Technical Paper / Journal Article
2011-04-12
Technical Paper / Journal Article
2010-04-12
Training / Education
2018-06-27
Training / Education
1997-11-03
Standard
1987-05-01