Browse Publications Technical Papers 2017-28-1965
2017-07-10

Implementation of Lean Approaches in Proto Body Build to Improve Productivity and Flexibility 2017-28-1965

Lean approaches are being implemented in various manufacturing facilities across the globe. The application of lean approaches are extended to Body proto build shop to maximize the efficiency of the shop with lesser floor space and optimized equipment. Weld fixture, Weld equipment and assembly tools are the major tools required essentially for proto BIW assembly. This paper explains how the Weld equipment planning was carried out with lean approaches and implemented effectively in proto body assembly shop. The implemented lean concepts are compared with Italy and Japanese proto body build makers to validate the frugal planning of the facility for the said intent. The implemented facility is capable of producing more than a model at a time. Weld parameter selection for weld gun, gun movement to the fixture with minimized change over time and movable weld gun gantry are the lean approaches implemented.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

Supplier Quality Engineering and Lean Manufacturing Integration

2017-01-0295

View Details

TECHNICAL PAPER

The Development of Lightweight Self-Piercing Riveting Equipment

2001-01-0979

View Details

TECHNICAL PAPER

A Methodology for Determining Process and System-Level Manufacturing Performance Metrics

2002-01-2900

View Details

X