1968-02-01

A Gas Turbine Laboratory with Computer Controlled Data Acquisition 680564

To implement a gas turbine development program, an engineering laboratory was expanded to provide five test cells and a process air station capable of delivering 30 lb/sec of air at 50 psig. An on-line computer controlled data system was included to speed data collection, reduce test reruns, and above all provide engineers with calculated results within minutes of the completion of a run.
The paper gives a brief description of the facility and its data system, and shows how such a facility can contribute to a gas turbine program.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
X