1973-02-01

Application of Field Loading to Laboratory Power Train Tests 730817

Complete power train assemblies are durability tested in the laboratory by applying real-time, field-recorded axle loads with an electrohydraulic servo system. Transmission shifting is servo-controlled, permitting testing with power shift and power shift-torque converter type transmissions. The load-control system permits selecting any duty cycle or combination of duty cycles for the laboratory loading. Computer analysis of field and laboratory load data gives a damage rate comparison and component life predictions. A general description of test objectives, equipment, and operation, as well as examples of test results and data comparisons, are given.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
X