SMC Heavy Duty Truck Hood; 12 Months From Concept to Production 881860
Simultaneous engineering techniques have been applied to a SMC truck hood to reduce the lead-time for production introduction from 22 months to 12 months. Several other technologies were also applied to insure a successful product introduction in this reduced timeframe: computer definition of the hood surface for accuracy, RTM prototype tooling for early design tryout and durability testing, Finite Element Analysis to further confirm durability of the hood structure, and brittle lacquer combined with strain gaging to provide life data using a hydraulic road simulator for load inputs.
Citation: Morrison, R., Strause, P., Pienta, W., and Krebs, J., "SMC Heavy Duty Truck Hood; 12 Months From Concept to Production," SAE Technical Paper 881860, 1988, https://doi.org/10.4271/881860. Download Citation
Author(s):
Robert W. Morrison, Peter W. Strause, Walter Pienta, John Krebs
Affiliated:
Freightliner Corporation
Pages: 16
Event:
SAE International Truck and Bus Meeting and Exposition
ISSN:
0148-7191
e-ISSN:
2688-3627
Related Topics:
Finite element analysis
SAE MOBILUS
Subscribers can view annotate, and download all of SAE's content.
Learn More »