Installation and Early Test Results of a 3 MW Kalina Cycle Demonstration Plant

Paper #:
  • 929011

Published:
  • 1992-08-03
Citation:
Leibowitz, H. and Zervos, N., "Installation and Early Test Results of a 3 MW Kalina Cycle Demonstration Plant," SAE Technical Paper 929011, 1992, https://doi.org/10.4271/929011.
Pages:
8
Abstract:
Data taken during the operating trials of the demonstration plant have confirmed the principles of the Kalina cycle technology. The demonstration plant is in the form of a 3 MW bottoming cycle located at DOE's Energy Technology and Engineering Center (ETEC) outside Los Angeles. The highlight events that have occurred during the past three years, some plant features and operating data are discussed.
Access
Now
SAE MOBILUS Subscriber? You may already have access.
Buy
Select
Price
List
Download
$27.00
Mail
$27.00
Members save up to 40% off list price.
Share
HTML for Linking to Page
Page URL

Related Items

Article
2017-03-13
Technical Paper / Journal Article
2010-10-25