Production Experience of a Ceramic Wall Flow Electric Regeneration Diesel Particulate Trap

Paper #:
  • 930129

Published:
  • 1993-03-01
Citation:
Kojetin, P., Janezich, F., Sura, L., and Tuma, D., "Production Experience of a Ceramic Wall Flow Electric Regeneration Diesel Particulate Trap," SAE Technical Paper 930129, 1993, https://doi.org/10.4271/930129.
Pages:
15
Abstract:
Demonstration projects of many Diesel Particulate Traps have been and continue to be performed. Many experimental trap systems require software customization to an individual vehicle to account for duty cycle and component variations. This level of customization is not practical in a production environment and in a marketplace where a trap system needs to function on many types of engines and duty cycles. This paper describes the production experience of the Donaldson Dual Ceramic Wall Flow Electric Regeneration Diesel Particulate Trap which has overcome specific production and durability obstacles.Data to be Included:System DescriptionSystem Performance Regeneration Intervals Engine Backpressure Fuel Economy Penalty Emissions Field lnstallations and Mileage ExperienceReliability Planning General Goal Setting Growth Test Program Reliability Tracking of Field Demonstration Buses Field Results Failure Analysis/Corrective Action Purging of Failures Development Activities Filter/Core Durability General Hardware Software Development Future System Enhancements EPA & CARB CertificationEmissionsDeterioration Factor
Access
Now
SAE MOBILUS Subscriber? You may already have access.
Buy
Select
Price
List
Download
$27.00
Mail
$27.00
Members save up to 40% off list price.
Share
HTML for Linking to Page
Page URL

Related Items

Training / Education
2016-03-07
Training / Education
2017-05-04
Training / Education
2011-04-12
Training / Education
2009-12-15
Article
2017-03-13
Training / Education
2015-07-13
Training / Education
2016-04-30