1962-01-01

A Technique for Management of Multiple Programs in a Medium Size Engineering Department 620361

A workable approach to controlling fiscal and technical progress for multiple, diverse engineering projects is described. The system includes techniques for estimating cost and time requirements as well as monitoring and measuring activity on a weekly or monthly basis. The techniques were designed to minimize the paperwork required on the working engineer level, and to maximize visibility.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
STANDARD

Containers, Shipping and Storage, Reusable

ARP1967B

View Details

STANDARD

Surface Preparation and Priming of Aluminum Alloy Parts for High Durability Structural Adhesive Bonding

ARP1524A

View Details

TECHNICAL PAPER

A Preliminary Human Factors Analysis of Naval Aviation Maintenance Related Mishaps

983111

View Details

X