1969-02-01

Douglas Design for Powerplant Reliability and Maintainability 690391

Reduction of aircraft maintenance costs has been a challenge to aircraft operators for many years. It is well known that powerplant maintenance costs are a significant percentage of these total costs. Douglas Aircraft Co. is using new methods, checks, and controls during the early design phases to guarantee that established goals for the DC-10 will be achieved. Programs have been developed that will result in high system reliability and ensure optimum maintainability. This paper describes the implementation of these programs for powerplants and associated systems.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

Properties of Aircraft Tire Materials

881358

View Details

TECHNICAL PAPER

Expert Systems for the Diagnostic of Auxiliary Power Units (A.P.U.)

920990

View Details

TECHNICAL PAPER

Neighboring Mobile Robot Cell with Drilling and Fastening

2017-01-2094

View Details

X