1979-02-01

Improving Business Jet Performance: The Mark Five Sabreliner 790582

Following the successful Mark II Learjet modification program. The Raisbeck Group set out to improve the performance of the Sabreliner series of aircraft. By applying a unique combination of theoretical analysis, flight test development and advanced FAA certification methods, the Raisbeck Mark Five Sabreliner became a reality. This configuration, with advanced aerodynamics, systems and structure has been incorporated on both existing and new production versions of the aircraft. It offers a minimum of 25% range increase while maintaining or reducing takeoff and landing field lengths. The development approach used for the Mark Five system is detailed, including the rationale for each of the improvements incorporated. FAA certification plan procedures used on this program are discussed. Performance improvements realized in actual operation of the Mark Five system are also detailed to demonstrate the advantages from a customer's viewpoint.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

FAR 23 Fatigue Substantiation Procedures: GAMA Committee Report

710403

View Details

TECHNICAL PAPER

Mating Aircraft Using Flexible Tooling via the Digital Thread

2012-01-1851

View Details

TECHNICAL PAPER

development of the SUPPRESSOR AND THRUST BRAKE FOR THE DC-8 AIRPLANE

590061

View Details

X