1988-07-01

Regenerative Life Support Program Equipment Testing 881126

Four regenerative ECLSS assemblies, built by Hamilton Standard, have been undergoing testing at NASA's Marshall Space Flight Center (MSFC) during the past year. This paper describes each pre-prototype assembly and presents test objectives and data accumulated over the period of July 1987 through June 1988. The primary test activity was NASA's Integrated Systems Metabolic Control Test conducted in MSFC's Core Module Integration Facility (CMIF). This paper describes the operation and performance of the TIMES urine reclamation assembly and the Sabatier CO2 reduction assembly in that test. The other two technologies covered are the bench testing of the SAWD CO2 removal assembly and the integrated propulsion testing of the Static Feed SPE® O2 generation assembly.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
X