1994-03-01

Supplier Improvement Process Plan 940661

Ford Motor Company Powertrain Engineering instituted an innovative Work Process Plan designed to evaluate, develop, and improve it's selected long-term supplier base. This process was implemented in 1987 and continues to function improving our suppliers capabilities in the areas of Product & Manufacturing Engineering, Quality, Production Control, and Sales/Purchasing Interaction.
A pilot Supply Base Development, Casting and Machining team was set -up in July, 1987 to assist the casting, machining, piston, and ring supply base. The success of this team lead to the fornation of three additional Supply Base Development teams within the following year to assist suppliers in Sealing, Assemblies, and Front End Accessory Drive (FEAD) commodities.
The benefits of this process to Ford and it's suppliers has resulted in assisting two suppliers to reach the TQE level, support the Ford directive to bring all suppliers to the Q-1 level, guide suppliers not meeting the minimum technical levels required by Ford Powertrain to meet those levels, and institute cross-functional training and team building at Ford and it's suppliers.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
We also recommend:
TECHNICAL PAPER

Limitations in the use of On-Llne and Off-Line Studies to Identify Factors Affecting Front End Alignment

890656

View Details

STANDARD

Insulation, Sound and Thermal Resin-Bonded Glass Fiber, Medium Filament

AMS3676D

View Details

TECHNICAL PAPER

WIzARD: Weld Inspection And Reporting Database Software development, implementation, and application

2000-01-2677

View Details

X