1993-07-01

Tethered Satellite System Deployer Flight Thermal Performance 932157

The Tethered Satellite System (TSS) is a Space Shuttle payload that was flown on July 31, 1992. Though anomalies prevented full deployment, the duration of the mission was approximately as planned, so it was possible to assess system thermal performance. The deployer, which supports the satellite and controls tether movement, has a thermal design that includes multilayer insulation, heaters, and the Spacelab Freon Loop. The Deployer Thermal Subsystem met all requirements, and there were no anomalies during the flight. This paper summarizes the TSS deployer thermal design and compares pre- and post-flight thermal analyses. It also describes simplified personal-computer thermal models of the TSS-1 and presents analysis results for the as-flown timeline.

SAE MOBILUS

Subscribers can view annotate, and download all of SAE's content. Learn More »

Access SAE MOBILUS »

Members save up to 16% off list price.
Login to see discount.
Special Offer: Download multiple Technical Papers each year? TechSelect is a cost-effective subscription option to select and download 12-100 full-text Technical Papers per year. Find more information here.
X